|
The Challenge:
A community college with high turnover in operations and maintenance staff
needed to automate their disparate building controls and reduce energy and
maintenance costs. They also wanted to add training and
demonstration for renewable energy systems.
The Solution:
PEConsulting worked closely with the local electric utility to provide
grants for demonstration photovoltaic (solar) systems and integrated
building automation controls.
PEConsulting also worked directly with the college's architect to develop
design guidelines for all their future building renovation projects to
minimize operating costs and standardize HVAC systems.
|